Friday, April 22, 2011

Setting up Reliant Generator Switch to Set up Off Grid System Room by Room

Al shows us how he installed the Reliant Generator Switch and power transfer panel for the 12 volt battery bank and Harbor Freight solar panels is now installed and just waiting for a connection to the inverter before going into production. The shed is also getting wired properly and after that is done we're running conduit and power to the new barn in the back.

Al decided to hire a journeyman electrician to help me so he could finish all the projects before summer. His brother does carpentry so he'll come to help finish panel up the barn and wall up and insulate the shed room plus build a door for it. Then the remaining Harbor Freight solar panels are going up to supplement the existing ones and finally the two wind turbines will go up.




Everything You Need to Produce Your Own Solar Energy.....Check Out New World Solar Power!

No comments:

Post a Comment